Yokosuka City hygiene testing laboratory
As a result of logical and analytical design process, we came up with this very unique design.
First we placed main corridor in the center, to provide maximum room area. Then in order to secure smoke elimination, we made vertical void and sectioned off the research zone. 
Floor plan is slightly distorted, following the curve lines of buried pipes underground. And since we had to squeeze in large base-isolation construction within the site boundary, we carefully studied slanting angle of exterior wall at each floor level, to provide maximum area of laboratories.